Thermaltake WATER2.0 Pro Review

👤by David Mitchelson Comments 📅06-11-12
Installation Process

In order to demonstrate the installation process for Water 2.0 Pro we are installing the cooler on the Intel LGA2011 socket. Thermaltake have a very informative set of insutrctions on the product page for this cooler, showing clear pictures of how to install the cooler: http://uk.thermaltake.com/products-model.aspx?id=C_00001882

The first step is to attach the relevant screws and adapters to the socket ring. Once attached the screws can rotate to suit a variety of different sockets but the LGA2011 socket requires the thicker screws in order to fit properly. Once this has been performed, the socket ring must be attached to the pump – there are a series of ridges which fit into the pump once lined up a plastic retention clip is snapped into place to prevent the ring from separating from the pump. After this the only thing left to do is to place the pump over the socket and tighten up the screws. It’s advisable to tighten two screws at the same time and corner to corner in order to apply even pressure.

The radiator can be installed in different places but it’s advisable to remove the rear exhaust fan inside the computer chassis and have one of the 120mm fans attached in its place along with the radiator and the other fan.







12 pages « < 4 5 6 7 > »

Comments